Congratulations with your purchase of our high quality,
corrosion free hot water cylinder. (HWC).
If you are the installer, please follow the installation instructions carefully, AND check the final installation according to the instructions.
The XstreamTM MAINSTREAMTM range can only be installedin a HORIZONTAL position.
Enquire about our UPSTREAM range for vertical installations.
When connecting solar panels to the MAINSTREAMTM DUAL range, the element should be placed in
the upper element position at the rear end of the tank. This will ensure maximum use is made from
solar energy.
When connecting solar panels to the MAINSTREAMTM DUAL range, we recommend the thermostat
to be set at 60°C. This will supply the minimum of electrically heated hot water, with electric element
is positioned in the upper half of the tank.
In selecting the absorption area (panel size), it is important to use 65 - 80l of storage water
per square meter of panel, e.g. 200 litre HWC will use a 3m² panel (67 litre / m²).
Please ensure proper insulation is installed on all exposed pipework.
We supply our tanks with copper-to-copper conex fittings for ease of installation.
Please hold the rear nut with a spanner when the connections are done to the fittings provided.
No soldering is allowed. The supplied fittings must not be removed.
SOLAR OPTION:
Remember that the cylinder MUST be installed at a higher point than the highest point of the solar panel,
so that the heated water from the panel can siphon through the HWC. You are advised, when the
solar option is considered in areas with freezing conditions in winter, rather to use our SolarstreamTM HWC
(indirect system, fitted with heat exchanger). Should you wish to install the storage tank at a
position lower than the absorption panel, a circulation pump of some sort will be required.
Please contact our factory for options.
Proceed as follows: (Interior Installation)
• Position the drip tray, sloping towards the outlet in a secured position.
• Place the XstreamTM HWC inside the drip tray, ensuring that the fittings are inside the drip tray.
• If a solar panel is not connected, block the solar in- and outlet to be opened at any future time
if a panel is to be connected, and position element in the lower end.
• Connect the incoming cold line to the inlet (at bottom of HWC). Use a male inlet coupler (MIC).
• Ensure a suitable (up to 400kPa) pressure reducing valve (PRV) is connected to the incoming line
AND that the cold supply is taken from a point AFTER the PRV. This will ensure balanced pressure
(Hot and cold water supply at a mixing tap having the same pressure).
• Install a vacuum breaker at least 300mm above the HWC.
• Connect the hot water supply line from the outlet (on top of the HWC),
also installing a vacuum breaker as per cold inlet.
• Please ensure copper tube is used on the hot water supply line.
• Connect copper tube to the temperature and pressure safety valve (T&P) and take it at a slope to the outside.
Try to minimize sharp bends.
• The T&P valve (Temperature and Pressure (safety) valve) can be adjusted to the required angle.
Loosen the securing nut, adjust the angle and fasten the nut and the desired angle.
• Fill the HWC with water. Leave a hot water tap open to get any extra air out of the system.
• Once filled, close the tap.
• Proceed by connecting the electrical supply. Open the electrical box and connect the electricity line.
Always ensure the electricity line is dead when working with electricity. Ensure a suitable qualified artisan
performs this function.
• Install a suitable isolator switch within easy reach of the HWC.
• ALWAYS ensure that the HWC is filled with water BEFORE the electrical supply is commissioned. Failing this the HWC and
submersible element might be damaged.
• Check all fittings for leaks, and ensure all supply lines are properly fastened and secured to fastening points; thereby minimizing strain on
the fittings attached to the HWC.
• Never remove the supplied copper fittings from the HWC.
Proceed as follows: (Exterior Installation)
• All procedures as per interior installation, however, instead of using the drip tray use the stainless steel straps provided.
• Us a spirit level and mark the points where the straps are to be positioned -
allow 300mm from both ends of the HWC.
• Use at least 10 x 100mm suitable anchoring bolts for wall installations, or other suitable
securing bolts for roof installations. Properly secure the straps (provided).
Push the HWC through the loops and proceed with connecting procedures as described.
Please contact our Service Desk on +27 21 872 0900 if any further assistance is required.
ENJOY YOUR HOT WATER SUPPLIED BY OUR XSTREAMTM CORROSION FREE HOT WATER CYLINDER!





Xstream Solar Hot Water Cylinders (Pty) Ltd. All Rights Reserved.
Last updated 28.11.11
Installation guide
Dual
International Patent Holder
Patent #: ZA Pat 2007/02408
ZA Pat 2000/4410
AUS Pat: 736108
Tel: +27 21 872 0900
Fax: +27 21 872 8604
E-mail: info@xstream.co.za
Website: www.xstream.co.za
Distillery Road
Paarl
7646
PO Box 3132
Paarl
7620
TM
TM
TM